Free PDF downloads · No account required · Sized for reMarkable, Supernote, BOOX, Kindle Scribe, A4, and US Letter.
Action-Item Tracker
Tabular action-item tracker with columns for checkbox, action, owner, due date, and status.
Preview
Table layout with column headers
Checkbox | Action | Owner | Due | Status
Maximizes rows per page
Preview settings: reMarkable 2 (1404×1872) · portrait · right-hand binding · regular ink · 3 pages
120
Using this template
A practical workflow, not just a blank page
Teams and project owners who need one reliable list of commitments, owners, dates, and status.
How to use it
- 1Write each action as a specific outcome.
- 2Assign one owner and a realistic due date.
- 3Review the status column at the next meeting.
Why the page is arranged this way
The checkbox and action sit first because completion is the primary decision; ownership and timing follow in reading order.
Configure it deliberately
Use landscape orientation when actions or owner names are long. Add pages for each project or review period.
What the sample contains
A one-page action register with owner, due-date, and status columns.